Kitchen flooring

Kitchen flooring

Floors that meet the rest of the house cleanly. Wood, porcelain or heated tile, with the transitions drawn in advance.

  • $3,600 to $16,000
  • 3 to 7 days plus cure
Detailed view of brown wooden planks showing rich texture and patterns.
White oak, site finishedRift and quartered

What this scope actually covers

Kitchen floors take spills, dropped cast iron and a dishwasher that may one day leak. We choose the assembly for that reality and for how it meets the adjoining rooms, which in most Nashville houses means an existing oak floor of an unknown finish.

When we can, we weave new oak into the old rather than cutting a threshold at the doorway. Weaving takes longer but removes the strip of trim that tells everyone the kitchen was done later.

Tile floors get a decoupling membrane over the subfloor, because older joist spans move and rigid mortar beds crack. Heated floors get the mat, the sensor and the thermostat wired during electrical rough-in.

Line by line

What is included

  • Subfloor assessment

    Deflection check, moisture readings and flatness measurement before we specify anything.

  • Prep and levelling

    Self-levelling compound or plywood underlayment where the substrate needs it.

  • Wood installation

    Site-finished or prefinished plank, woven into existing oak where the layouts allow.

  • Tile installation

    Decoupling membrane, large-format-rated mortar and joint layout centered on the room.

  • Radiant heat option

    Electric mat, floor sensor and programmable thermostat, wired under permit.

  • Transitions and trim

    Thresholds, reducers, shoe moulding and appliance undercuts detailed on the drawings.

How it runs

The sequence

Each step has a named owner on our side and one decision on yours. Nothing starts until the previous step is signed off.

Empty room with a concrete mixer and tools, ideal for renovation concepts.
Site sequence3 to 7 days plus cure
  1. 01

    Assess

    We pull a vent or a threshold to see the existing assembly before quoting.

  2. 02

    Specify

    Material, underlayment and transition details drawn and approved.

  3. 03

    Install

    Two to four days depending on material and whether heat is included.

  4. 04

    Finish and cure

    Site-finished oak needs two to four days of cure before cabinets or heavy traffic.

Why it is worth it

What you get that you would not get elsewhere

  • New oak woven into the existing floor so the kitchen does not read as an add-on
  • Decoupling membrane under tile to resist cracking on older joists
  • Appliance undercuts and dishwasher clearances checked before install
  • Radiant heat coordinated with the electrical rough-in rather than bolted on later
  • Flatness verified so cabinets sit without a shim stack

What moves the price

  • Existing subfloorPlank subfloors and springy joists need underlayment or sistering.
  • MaterialPrefinished engineered, site-finished solid oak and large-format porcelain span a wide price range.
  • WeavingLacing new oak into existing flooring costs more than a doorway threshold but looks far better.
  • Radiant heatMat, sensor, thermostat and the extra height at transitions all factor in.
  • Room sizeSmall kitchens carry a higher cost per square foot because setup dominates.

Straight answers

About this scope specifically

Questions we get asked most often about this exact piece of work. The full list covers cost, schedule, materials and permits.

All questions

For wood, we generally run the floor under the cabinet run so a future cabinet change does not leave a hole. For tile, we run to the cabinet face and save material.

Usually. Most Nashville houses of that era used 2 1/4 inch red oak strip. We match width and species, then blend the stain on site with test boards.

In a kitchen where people stand for long stretches, most clients say yes. The running cost is modest because it is only on during cold months and on a timer.

Prefinished material is walkable immediately. Site-finished oak needs 24 hours between coats and two to four days before furniture.

Get a real number for your kitchen

Two hours in your kitchen with a laser and a camera, then a budget band the same week. No pressure and no design fee to find out.

4.9 from 218 homeowners · 412 kitchens since 2009 · Five year warranty

Cookie preferences

Choose which cookies you allow. You can change this at any time from the link in the footer.