The new oak is woven into our 1924 floor and I still cannot find the seam. Victor sent photos every Friday without being asked.
Marcus WhitfieldEast Nashville · Full kitchen remodelFebruary 2026
4.9 average from 218 homeowners
We ask for a review at the 30 day visit and again at twelve months, because the second one is the honest one. Both are published here.

They removed a wall I had been told for six years could not be removed. The header sits flush and the ceiling line is dead straight.
Reviews shown are sample content for this demonstration site.
The new oak is woven into our 1924 floor and I still cannot find the seam. Victor sent photos every Friday without being asked.
Marcus WhitfieldEast Nashville · Full kitchen remodelFebruary 2026
We cooked dinner every night except two. For a household with a newborn on the way that mattered more than anything else.
Tessa Lindqvist12 South · Cabinet refacingJanuary 2026
We hosted 22 people six weeks after they finished and the kitchen never looked like a kitchen mid-party. The scullery earns its space.
Danielle OseiGreen Hills · Full kitchen remodelNovember 2025
They fabricated the steel shelving in their own shop and matched the patina on the building columns. Nobody else offered that.
Aaron KesslerThe Gulch · Islands & seatingOctober 2025
Thanksgiving had four people working at once and nobody had to say excuse me. The supported overhang was worth every dollar.
Robert ElleryFranklin · Islands & seatingSeptember 2025
Nadia showed us the slab photo with the cut lines drawn on it. The seam landed exactly where she said it would.
Hannah KirkpatrickBrentwood · Countertops & stoneAugust 2025
Ninety four square feet and we gained a pull-out pantry. Imani found it by moving two cabinet widths by an inch each.
Luis FerreiraEast Nashville · Small & galley kitchensJuly 2025
Lighting is a genuine improvement, and the panel work was clean. The scheduling slipped a week when the inspector rescheduled.
Claire BenningtonGreen Hills · Lighting & electricalJune 2025
The zellige was sorted before it went up so the color variation looks intentional. They drew the wall elevation first, which I appreciated.
Devon AchebeGermantown · Backsplash & tileMay 2025
Site finished oak, woven into the hallway. Three days of cure and then it was done. Clean crew, no dust in the rest of the house.
Sarah Mendelsohn12 South · Kitchen flooringApril 2025
The fixed scope document was the most detailed thing we received from any of the four builders we interviewed. Two change orders total.
Greg TanakaFranklin · Full kitchen remodelMarch 2025
They told us at the survey that our cooktop island could not become a range island without re-ducting through the second floor. They were right, and they priced it honestly.
Monique DelacroixBrentwood · Full kitchen remodelFebruary 2025
Excellent doors and hardware. One drawer front arrived with a nick and was replaced in four days from their own shop, which was fast.
Ian McAllisterEast Nashville · Cabinet refacingJanuary 2025
Book-matched island seam that I have to point out to guests before they notice. The care sheet for the quartzite was genuinely useful.
Beatriz AlvarezGreen Hills · Countertops & stoneDecember 2024
No reviews in that scope yet. Choose another filter.

Two hours in your kitchen with a laser and a camera, then a budget band the same week. No pressure and no design fee to find out.
4.9 from 218 homeowners · 412 kitchens since 2009 · Five year warranty
We value your privacy
We use cookies to run this site, remember your preferences and understand how it is used.Cookie policy